اسم العميل: شركة تشيميتكس آريا. (ايران – ماهشهر) Project Name: 5000 t/a SBA/MEK Project Project Status: Commissioned Project Description: The first Methyl Ethyl Ketone (MEK) project in the Middle East DCS: 1,136 Input/Output (I/O) points ESD: 256 Input/Output (I/O) points Installation Package: SUPCON ECS-100 DCS ESD System: GE Fanuc Instruments Package: Supplied entirely by SUPCON
Scope of Work: The scope included Engineering Design, Fabrication, System Integration and Testing, Factory Acceptance Testing (FAT), Commissioning, and Startup Assistance for both DCS and ESD systems. It also involved procurement of instruments, installation supervision, and documentation.