Petroleum Engineering and Development Company (PEDEC)

As one of the reliable companies in the field of engineering and implementation of industrial projects, Ava Espikoo Sanat has worked closely with the Oil Development and Engineering Company (PEDEC). In this cooperation, the responsibility of programming the SUPCON control system has been the responsibility of Ava Espikoo Sanat

Scope of Work

  1. Design & Engineering: Detailed engineering of the integrated systems, ensuring all technical requirements meet industry standards and client specifications.
  2. Prototyping & Fabrication: Manufacturing and assembling all necessary hardware and control panels, ready for integration with field devices.
  3. Factory Acceptance Testing (FAT) & Integrated FAT (IFAT): Complete system testing at our facilities to ensure operational integrity before on-site installation.
  4. Installation & Commissioning: Installing the ICSS package on-site, including field devices, control panels, and system integration, awaiting the final commissioning phase.

Our Contribution

We were responsible for the programming of the SUPCON control system

Project Overview: ICSS Package for PEDEC (NIOC)/SINOPEC

Client: PEDEC (NIOC) / SINOPEC

Location: Ahwaz, Iran

Project Name: ICSS (Integrated Control and Safety System) Package

Project Status: commissioning

Project Description:

The ICSS package is designed to integrate various critical systems to ensure safe and efficient operations across multiple sites. This includes the Process Control System (PCS), Emergency Shutdown System (ESD),Fire and Gas System (FGS), Operator Training Simulator (OTS),Maintenance Management System (MMS), Corrosion and Integrity Management System (CIMS),Hazardous Area Control System (HACS), Leak Detection System (LDS), and High Integrity Pressure Protection System (HIPPS).

Installation Package:

SUPCON: Process Control System (PCS), Operator Training Simulator (OTS)

HIMA: Emergency Shutdown System (ESD), Fire and Gas System (FGS), High Integrity Pressure Protection System (HIPPS)

Total I/O Points: 15,000

SUPCON control system programming

Scope of Work

  1. Design & Engineering: Detailed engineering of the integrated systems, ensuring all technical requirements meet industry standards and client specifications.
  2. Prototyping & Fabrication: Manufacturing and assembling all necessary hardware and control panels, ready for integration with field devices.
  3. Factory Acceptance Testing (FAT) & Integrated FAT (IFAT): Complete system testing at our facilities to ensure operational integrity before on-site installation.
  4. Installation & Commissioning: Installing package on-site, including field devices, control panels, and system integration, awaiting the final commissioning phase.

Our Contribution

We were responsible for the programming of the SUPCON control system

Project Overview: ESD- F&G Package for PEDEC (NIOC)/CNPC

Client: PEDEC (NIOC) / CNPC

Location: Ahwaz, Iran

Project Name: ESD- F&G Package

Project Status: commissioning

Project Description:

Emergency Shutdown System (ESD),Fire and Gas System (FGS)

Installation Package:

SUPCON: Emergency Shutdown System (ESD),Fire and Gas System (FGS)

Total I/O Points: 2,000