Client Name: Petrotech Pharma Chemical Industries Co. (Iran – Arak)
Project Name: 10,000 t/a Amino Acid Production and Development Phases 1, 2, and 3 (Cyanide)
Project Status: Phase 1 FAT completed; ongoing progress
Project Description: Distributed Control System (DCS) with 1,430 Input/Output (I/O) points across 3 sections, Emergency Shutdown System (ESD) with 501 I/O points across 3 sections, and Fire & Gas System (FGS) with 246 I/O points in 1 section.
Installation Package: SUPCON JX-300XP DCS
ESD and FGS Systems: GE Fanuc ESD and FGS
Scope of Work: The scope includes Engineering Design, Fabrication, System Integration and Testing, Factory Acceptance Testing (FAT), Commissioning, and Startup Assistance for DCS, ESD, and FGS systems. Instruments (including SUPCON Transmitters) were provided.