Client Name: Chimitex Arya Co. (Iran — Mahshahr)
Project Name: 5000 t/a SBA/MEK Project
Project Status: Commissioned
Описание проекта: Первый проект по производству метилэтилкетона (МЭК) на Ближнем Востоке.
DCS: 1,136 Input/Output (I/O) points
ESD: 256 Input/Output (I/O) points
Installation Package: SUPCON ECS-100 DCS
ESD System: GE Fanuc
Instruments Package: Supplied entirely by SUPCON
Scope of Work: The scope included Engineering Design, Fabrication, System Integration and Testing, Factory Acceptance Testing (FAT), Commissioning, and Startup Assistance for both DCS and ESD systems. It also involved procurement of instruments, installation supervision, and documentation.